top of page

Our Special Thanks goes to our Contractors, who worked so hard and efficiently to make the Bowling Green a reality

___________________________________________________________________

Constructing the Green, with underground Drainage System; Concrete Side Ditches; Top Quality Turf; full Perimeter Slabbed Pathway:

                               Arc Ground Care Ltd

                                 Whitlenge Farm

                                 Whitlenge Lane

                                  Hartlebury

                                  DY10 4HD

 

                           ______________________________

Automatic Irrigation System, with a Sprinkler in the centre of each side of the Green; 10,000 Litre Water Storage Tank; Top Quality Pump:

                             Waterfield Solutions Ltd

                                 Laburnum House
                                10 Coventry Road
                                 Broughton Astley
                                 Leicester

                                 LE9 6QA

 

                        _______________________________

New Electrical Installation up to the Site Boundary:

                                  E.ON Connection Services
                                      Waterfront House
                                       Lakeside Court
                                       Osier Drive
                                       Sherwood Business Park
                                       Annesley
                                       Nottinghamshire
                                       NG15 0DS

 

                     _______________________________

Electrical Connections, from the Site Boundary to the Clubhouse area; installation of Distribution Board inside the shed; installing two Electric Sockets inside the shed; installing a Light inside the shed; providing a valid Electrical Installation Certificate.:

                              Delta Electrical Services

                                   The Lodge

                                    Boscomoor Lane

                                    Penkridge

                                    Stafford

                                    ST19 5NU

 

 

                  ______________________________

Security Fence, enclosing the Green's Site; Fencing to the same specification as the existing Council Fence along Engleton Lane; Single Pedestrian Entrance Gate (with Latch), allowing entrance from Engleton Lane into the Site:

                                Boundary Services Ltd

                                       Unit 8

                                       Four Ashes Industrial Estate

                                       Station Road

                                       Four Ashes

                                      Wolverhampton

                                      WV10 7DB

 

 

                       ___________________________

 

 

Approval for a new Foul Sewerage Connection to the Local Authority Foul Sewer in Engleton Lane:

                              Severn Trent Water

                                New Connections
                                PO Box 531 1
                                Coventry
                                CV3  9FL

                       ____________________________

Installation of new Foul Sewerage from Clubhouse Area to Site Boundary; locate Local Authority foul sewer in Engleton Lane and form new connection with pre-formed junction; create 1 Demarcation Chamber ; backfill and reinstate tarmac and landscaped area and transfer excess spoil to licenced tipping facility:

 

                           PB Maintenance Solutions 

                        Unit F3a Hives Industrial Estate

                        Primmrose Avenue

                        Wolverhampton

                        WV10 8AW

                        

                       ____________________________

Authorising the Standard Water Connection to the Water Service Pipe at the Site Boundary:

                         Severn Trent Water Limited
                             Capital Income Team
                             PO Box 5311
                             Coventry
                             CV3 9FL

                     ____________________________

Installing a Water Service Pipe from the Site Boundary to the Clubhouse Area (plus providing and connecting a temporary Standpipe, until the Clubhouse is built):

  

                           PB Maintenance Solutions 

                        Unit F3a Hives Industrial Estate

                        Primmrose Avenue

                        Wolverhampton

                        WV10 8AW

                   ______________________________

           

 

                          

                                 

                                        

                        

bottom of page